Cookie Control

This site uses cookies to store information on your computer.

Some cookies on this site are essential, and the site won't work as expected without them. These cookies are set when you submit a form, login or interact with the site by doing something that goes beyond clicking on simple links.

We also use some non-essential cookies to anonymously track visitors or enhance your experience of the site. If you're not happy with this, we won't set these cookies but some nice features of the site may be unavailable.

By using our site you accept the terms of our Privacy Policy.

(One cookie will be set to store your preference)
(Ticking this sets a cookie to hide this popup if you then hit close. This will not store any personal information)

Infrastructure: Engineers Rebuild Behemoth In Face Of Earthquake Risks

ALAMEDA COUNTY, Calif. — If you think the era of big dam building is over in America, check out the Calaveras project.

Since 2001, construction crews have been excavating a gap in a ridge as tall as a city skyline near San Jose. They've sliced off part of a hillside and laid a concrete spillway longer than four football fields with 50,000 cubic yards of cement — enough to pave a sidewalk between Washington, D.C., and New York.

A custom conveyor belt this spring will carry 3.5 million cubic yards of earth — the same amount used in Egypt's Great Pyramid of Giza — to build a 220-foot dam.

Calaveras is the country's largest new dam project. And it's only 1,200 feet downstream from another dam."

Jeremy P. Jacobs reports for Greenwire April 24, 2017.

Source: Greenwire, 04/25/2017