SEJ
Published on SEJ (https://www.sej.org)

Home > "Ground Broken for Frozen Soil Wall at Fukushima Nuclear Plant"

"Ground Broken for Frozen Soil Wall at Fukushima Nuclear Plant" [1]

"Work started June 2 on a 32-billion-yen ($314 million) project to build an underground frozen wall at the stricken Fukushima No. 1 nuclear plant to address a chronic problem plaguing work at the site.

The plan is for the wall of frozen soil to divert groundwater into the ocean and prevent it from seeping into reactor buildings and becoming contaminated by radiation.

But given the enormity of the project--unprecedented in terms of scale and period of use--numerous risks and potential hazards exist."

The Asahi Shimbun had the story June 3, 2014. [2]

SEE ALSO:

"At Fukushima, Ice Is Just Another Brick in the Wall of Denial" (Aljazeera America) [3]

Disasters [4]
Nuclear Power & Radiation [5]
International [6]
Public [7]
Source: Asahi Shimbun [2], 06/04/2014
  • Contact Us  |
  • Donate  |
  • Join  |
  • Members  |
  • Privacy & Security Policies  |
  • Reach SEJ Members  |
  • Renew  |
  • Site Map
The Society of Environmental Journalists
1629 K Street NW, Suite 300, Washington, DC 20006
Telephone: (202) 558-2055
Email: sej@sej.org
© 2026 The Society of Environmental Journalists. All Rights Reserved.
All graphics © SEJ, unless otherwise stated.

Source URL:https://www.sej.org/headlines/ground-broken-frozen-soil-wall-fukushima-nuclear-plant

Links
[1] https://www.sej.org/headlines/ground-broken-frozen-soil-wall-fukushima-nuclear-plant [2] http://ajw.asahi.com/article/0311disaster/fukushima/AJ201406030043 [3] http://america.aljazeera.com/blogs/scrutineer/2014/5/27/at-fukushima-iceisjustanotherbrickinthewallofdenial.html [4] https://www.sej.org/category/topics-beat/disaster [5] https://www.sej.org/category/topics-beat/nuclear-power/radiation [6] https://www.sej.org/category/region/international [7] https://www.sej.org/taxonomy/term/81